With the shiny new span of the Bay Bridge complete, California is now in the throes of a second, parallel construction project—or deconstruction project, really. The old Bay Bridge span, some 58,000 tons of steel and 245,000 tons of concrete, must come down. This week, officials decided that some of the bridge's steel will be set aside for public art in the Bay Area.
via Gizmodo http://ift.tt/1vmPgtf http://ift.tt/1pybiG1
No comments:
Post a Comment